NRGI Broker Expertos en Seguros para el Sector Energético
  • About Us
  • Services
    • Insurance
    • Consulting
    • Guarantees
  • Products
    • Well Control
    • Liability
    • Marine and Cargo
    • Cargo Transport
    • Energy
    • Environmental Liability
    • Construction and Engineering
    • Surety
    • Business Interruption
    • Physical Damage
    • Aviation
    • Employee benefits
  • News
  • Contact
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu

Complications during well control.

12 September, 2016/Our Core

Decontrol wells is generated by an outbreak, which cannot be operated at will, and is classified as:

  • Differential.- happens when formation pressure is greater than the hydrostatic pressure, invading the formation fluids down hole, lifting the column of fluid so that the ejected surface and surface equipment control is not closed .

  • Induced.- is caused by the movement of the pipe, which can probe or lighten the hydrostatic column or fracture the formation to enter complicated the problem by having broken pipes.

Given the lack of control proceeds to apply a specific method of control as the problem that generates it, but the reality is that few actions in the Well Control that occur as they are planned, so it is important to be familiar with complications that can occur during execution of the control.

Below you can find a list of the most common complications:

  • Capping / collapsed the ring

  • covered string

  • Failure of the BOP

  • Failure or damage coating

  • cement plug

  • Misconceptions

  • Complications during circulation of a Kick

  • Excessive pressure casing

  • Unreliable or unavailable reduced pressure

  • Drilling hot

  • Control Considerations Horizontal Wells

  • Hollow or weakness in Tubing

  • Freezing

  • Detection of free point

  • Float valve backpressure in the drill string

  • Fishing

  • Lost Circulation

  • Partial and severe circulation losses

  • Well´s mechanical problems

  • Milling

  • Pipe off the bottom and out of the well

  • Very weak or much corroded pipe

  • Changes in Tanks

  • Bit or clogged funnel

  • Pressure between the strings of coaters

  • Failure pressure gauges

  • Problems beyond the choke

  • Failure or change of pump

  • Reciprocated pipe during Well Control

  • Considerations closure pressures

  • Snubbing in the string or tumbing

  • Paste pipe

  • Telescoping string

Therefore, it is vitally important to always be alert to indicators of pressure, flow and equipment involved to recognize the emergence of outbreaks promptly and react seeking to avoid incidents and be protected with Insurance Well Control we support for any inconvenience.

In NRGI Broker we have an expert in Insurance Well Control and risk analysis that will provide comprehensive solutions, with proven products, which are tailored to suit your needs equipment.

 

Contact us, we are here to help:

[email protected]
(55) 9177.2100

Tags: hydrocarbons, Insuarnce, Well Control
Share this entry
  • Share on Facebook
  • Share on X
  • Share on LinkedIn
  • Share by Mail
https://nrgibroker.com/wp-content/uploads/2016/09/shutterstock_3476821191-e1473734278542.jpg 267 400 admin https://nrgibroker.com/wp-content/uploads/2023/08/nrgibroker-300x96.png admin2016-09-12 21:38:202016-10-04 13:45:40Complications during well control.
You might also like
Mexico expects to hold a third oil and gas auction in 2018
Spanish oil company Repsol enters the Mexican market
Over 20 Oil Companies Register for Auction Mexican Gulf Blocks
Mexico oil production to reach 2.6 mil b/d by 2025: Lopez Obrador
exploracion-y-extraccion-de-petroleo The security policy in the hydrocarbons sector
What is a Fiscal nonconformity bond?

Search

Search Search

Categories

  • Economy
  • Environment
  • Environmental Legislation
  • Hydrocarbons Storage
  • Insurance
  • International Markets
  • Marine
  • Marine and Offshore
  • Masonry (4 columns)
  • Mexico’s bidding rounds
  • Mexico’s Energy Reform
  • News
  • Oil & Gas
  • Oil Operators
  • Our Core
  • Pipelines
  • Risk Management
  • Surety and Guarantees
  • Uncategorized

Prolongación Paseo de la Reforma 1015 Torre A Piso 21.
Col. Desarrollo Santa Fe, Contadero,
C.P. 01219 Ciudad de México, México

Tel: +52 (55) 9177 2100

  • Facebook
  • Twitter
  • Linkedin
  • Youtube

Latest News

  • Breaking Barriers and Building the Future18 March, 2025
  • Fundamental factors to strengthen Pemex12 August, 2019
  • Offshore Project Development: The Road to First Oil26 July, 2019
  • Hydrocarbons Seminar “Fundamentals of the Hydrocarbons Sector in Mexico” generates proposals and knowledge31 May, 2019
  • Link to Facebook
  • Link to X
  • Link to LinkedIn
  • Link to Youtube
  • Home
  • About Us
  • Services
  • Products
  • News
  • Contact
  • Confidentiality notice
  • Terms of use
  • Cargo Transport
Scroll to top